Showing posts with label Snuggle Sweater. Show all posts
Showing posts with label Snuggle Sweater. Show all posts

Sunday, October 14, 2007

Just Checking In

I have not been enthusiatic about posting, because I still don't have a camera. ARRRGGGHHH!!!
Well, at least I found one that I like. I just have not had the time to go to the store to actually test it out. It is Sunday, the Lord's day of rest, and where am I?? At WORK. Well, I had to do it so that I could get next Friday off in order to relax for my drive up to Rhinebeck. I am so excited.

Onto the knitting news.....Here is my status report.

My stash has dramatically decreases because I gifted some of my yarn to my Mom's Godmother, who is about 80 years old. She crochets wraps for childern in her church. I took the big bin over to her house, and told her to dig in. She has limited mobility, so the fact that she was able to have yarn hand-delivered to her house made her very excited. I will do the percentage calculations later. Chances are, I have added as much as I have given away, since June. And, with Rhinebeck being less than 7 days away... who knows what will happen.

Secret of the Stole.
I am on Row 53 of hint #1. I just can't seem to find the right mixture of quiet, not being on a bouncing bus, phone not ringing time to work on it. I don't want to have beads spilling all over the place either. Hint #2 has been downloaded and is waiting in the wings. I am still excited about this project. Hopefully I will find some time before the end of the week to make some progress.
Central Park Hoodie #1
I bound off the buttonband with an I-cord bindoff, and it looks great. I seamed the right sleeve and side seam. I tried it on, and then I realize that my ribbing wasn't lining up properly on the sleeve or the side seam. Also, the center of the sleeve was not lining up with the shoulder seam. So, i decided to rip it out. I will make the sleeves into 2 separate tubes, then join them to the body. I already completed the left sleeve, and it is gorgeous.
Embossed Leaves Sock
The cuff of side number one has about 8 rows to go before I start working on the heel. I like this pattern.
Central Park Hoodie #2
I casted this on while I was going home on the bus on Either Wednesday or Thursday (can't remember, it is a blur now). Currently, it is my travel project, until it gets too big. I had some time to work on it yesterday, because I went to get a part replaced on my car and I had to wait 1 1/2 hours for them complete it. If I didn't have my knitting, I would have went bananas!! I decided to make it all in one piece, since the seams annoyed me so much on the first CPH. I am currently on the second cable cross row, which is about 6 inches into the pattern. In Trinidad we have a saying that goes " when it's nice, do it twice". The second time around is so much better.
Snuggle Sweater
She is relaxing in my closet. I have gotten near the end of the second 48-row pattern repeat. She is sitting nicely, and patiently waiting for my love.

All other projects are on the back burner until further notice.

Tuesday, August 21, 2007

You Can't Hurry Love...No You Just Have to Wait!

My falling In Love socks are complete. Finally!!! It took a visit to the doctor, and being in the waiting room FOREVER to get these babies done.

No more teasing DEB!!!

Time for show and tell.
Let me also add, that I just showed them off to Mommy, and her remark was "GET A LIFE!!!" Well, at least I'm not on drugs!!! She is just pissed that I will be going to Rhinebeck the weekend that she wanted me to help her decorate a wedding. Hey, I had my Rhinebeck plans before the couple set the date. Whatever!!! Hello??? Whose life is this? You can't get mad at people for doing whatever they want to do. So, Rhinebeck here I come. I need some more yarn, and I want some Ice Wine too.
Hmmm.. I guess that means no shawl for Mommy this winter. Oh well, more time for me to make sweaters.


Speaking of Sweaters, here is my update on the Snuggle sweater.
I have also set a deadline for the Central Park Hoodie. It was really cold today (60 degrees in August) and I wished I could have just put it on..but it's kinda hard to do that when it is in pieces. So, it will be blocked before the weekend, I promise. I need it for the Rhinebeck trip. September is around the corner, and then October will be here before you know it.

Tuesday, August 14, 2007

What a wonderful Knitta-Que weekend!!

Firstly, I must say that the Sisterfriends Knitta-Que was amazing. I had so much fun. I want to personally thank Chante and Sahara for planning it and making it possible. I also want to thank them for the lovely gift I recieved for helping out with the flyer. Sahara had a grab bag of goodies, and I picked this book, mainly because I have this sweater obsession now.

Here is a picture of Sahara working on a beautiful lace piece.


Here is a picture of Chante happily spinning. Yes the wheel really was moving that fast, and the camera caught a glimpse of it.


Also, here is Chante's coworker Kim, working on a pair of socks. She made the best carrot cake ever, and even though the cream cheese frosting splattered on me as I was trying to get it out of the pan, it was not a big deal becaue it was so sweet and scrumptious.



Here is Tawana, a fellow Brooklynite who has been my friend through this blogworld for a few months now.

This was the first time that we got a chance to meet face to face, and I am so happy. We are actually working on the Central Park Hoodie at the same time. I am persistently trying to get her to change her mind about putting it in hibernation, but she has this pretty little thing called a baby growing inside of her that is making it difficult. She is working on a little pair of Koigu socks in the picture, and I am sure she has so much more ideas for cute baby sweaters. Hey, how about a mini Central Park Hoodie so baby can look like mommy??? It will still be sweater weather when the baby comes along. I know, I won't give up!!

Also, in attendance was N'joya from the Harlem Knitting Circle. She was a joy to talk to as always. I am really feeling the color scheme that she has going on. Okay, my next project will be a size 15 needle project, because I am getting super jealous. LOL!!!


Speaking of projects, here is the update on my Snuggle Sweater.

Only 1 and a half more pattern repeats to go before I start the armhole decreases. This project is going by really fast. The pattern changes colors really quickly, so I am not getting bored. One even better thing is that the pattern comes from Knitting magazine (British) from March of 2006, and many knitters in the US have never even heard of it. This means that I will have a one of a kind sweater this winter... FINALLY!!! By the way, I touched a marked down designer cashmere sweater in Daffy's today, and it elt like Brillo compared to my Snuggle sweater. My goodness, and I didn't even block it with my lavender scented woolwash yet. I think I may get arrested by the fashion police for wearing this sweater too much. Rowan RYC/Cashmerino DK rocks!!!

Thursday, August 9, 2007

What a day! What a day!!

Okay. So I have many names for today..."Transit Hell".."Stupidity Unfolding".. "A tree gets plucked out of the ground by a Giant in Brooklyn"..

First...My transit ordeal.

I was supposed to take the Express Bus going into Downtown Manhattan, get dropped off near Battery Park, and walk to work within 5 minutes, log in to my computer, go to the Cafeteria for some coffee and a bagel, and then mosy on up to my desk and start to appease the bankers so that they can effectively make money for our company. WRONG!!!!!

I got to the bus stop, and was informed by two ladies that the bus I was supposed to be on just left.. actually two of them back to back. So I was pissed at a level of 4. Then, four buses came..Two midtown, and 2 running express to Downtown Brooklyn. I was pissed at a level of 6 by this point. I was advised that the 2 and 3 trains were not running, so taking the train was pointless. All of the midtown buses were packed, so I waited for the Downtown Brooklyn bus that was empty, and hopped on, hoping that I would transfer to a Downtown Manhattan bus at the checkpoint. So, we get to checkpoint and there is a mob of people. I call my cousin who goes online and informs me that even more trains are shut down, and I should just get to the bridge and walk to work from there...which would have probably been a 30-45 minute walk.

So, I figured, if I am going to walk, and stay away from the mob, I should get some food. I went into a breakfast deli place only for the sweet man working there to tell me that there was no meat whatsoever, so I could not have my egg sandwich with turkey bacon, or bacon, or anything else. The stove wan't even turned on, so I left. I was pissed to a point of 8 by this time.

A downtown bus appeared to the rescue and had room for about 5 people, standing room only. I jumped on with the speed of a gazelle. The bus started to move towards the Prospect Expressway, and that is when I saw this:


I was on a total state of shock. The jolly green giant that pulled it up damaged some really nice cars too, but the bus was going so fast that I didn't get a pic.

So, as I am riding on the bus, and I see other buses packed with other people, I saw the "Stupidity unfolding". There was a woman actually sitting in the stairwell of the bus, while we were on the highway. Hello??? Do you want to fall out and watch your skull crack open? What do you think the "no standing in front of white line" is for? So, I guess acts of God causes the MTA to shut down, and people to forget all about safety. Then, about 2 seconds later, I see some men riding in a blue van, with no rear passenger seats, with the rear door and the passenger door OPEN. Hmm... free A/C anyone??? Another potential skull-cracking incident.


On to the knitting, now!!!
Today was Stitch N Pitch, so I decided to begin a new pattern that was an easy stitch (Stockinette) for the purpose of mindless knitting while watching the game. I am starting my Snuggle Sweater. Here is the prepwork:


And since my office was a Ghost town, here is a progression of my work.

11:00 AM

5:00PMAfter Stitch N Pitch

I must say, that this yarn is quite lovely. It is extremely soft, and the pattern has just enough color changes to keep me interested.
So, I pose a question.
- The rows are even numbered, until I get to one specific color that calls for 3 rows. So, all the yarn is carried to the right on the "Right Side" of my work. So, do I (Gasp!) cut the yarn that takes up 3 rows, instead of trying to carry it ? I will have to begin the next color segment on the Wrong side. How do we fix that?

Friday, July 20, 2007

I Fell Halfway in Love

It has been a while since I posted, but good news. I completed 1 side of my Falling In Love sock today, and in order to prevent Second Sock Syndrome, I immediately casted the second one on.

I almost had a heart attack today, because I bound off, cut a tail in the yarn, then tried on.... and it would not go on. Of course, I bound it off too tightly. So, I then did it all over again, loosely, and it was perfect.

I have to visit the hair salon tomorrow, so that will be about 2 hours of knitting while I wait for my hair to dry. Long plus thick hair is a mixed blessing. I hope that is enough time to get past the heel. We will see.

So, I have been taking some pictures of my stash to get some artwork for a flyer that I am creating. This is the raw, un-photoshopped version.

While doing this, I remembered that there was a specific project that I bought this yarn for. It is from a magazine published in the UK called "Knitting", the March 2006 issue. It was designed by Jean Moss, and I think this sweater is so adorable. It uses Rowan's Cashsoft DK yarn, so I know it will be super soft and supple once it is knit. Here is my swatch being blessed by the angels. OK so, I know my swatch is not the full 4 inches in length, but I figure if I use the specific yarn that the pattern calls for, and the actual needle size, I should be okay. I plan to knit the 34" size. I am not going to be crying about the fit later on, because the yarn is being blessed by the angels. Someone, tell me you have faith along with me. Can I get an AMEN!!!

Here is what the sweater will look like. I substituted some colors, so that I can get a more "pinkish" sweater. There is a sky blue, brown, and red that I have replaced with wine, fuschia, and lilac. I have a pair of pink boots that would match this baby perfectly. You know I am a fashionista at heart.